After surviving the storm with no power loss my area has decided to join in and have a power outage this morning. I keep trying to turn on lights anyway.
Edit: outage tracker showing someone expected to arrive to assess the fault at 6:43 but is “delayed”. This does not bode well for a speedy resolution.
Bonus Edit: Now at nearly four hours without power and the fault is still listed as “awaiting assessment”.
After surviving the storm with no power loss my area has decided to join in and have a power outage this morning. I keep trying to turn on lights anyway.
Edit: outage tracker showing someone expected to arrive to assess the fault at 6:43 but is “delayed”. This does not bode well for a speedy resolution.
Bonus Edit: Now at nearly four hours without power and the fault is still listed as “awaiting assessment”.
Happy Edit: Power is back!