Welcome to the Melbourne Community Daily Discussion Thread.

  • Taleya
    link
    fedilink
    arrow-up
    8
    ·
    1 year ago

    digging out greenhouse footings - the slope means that a 200mm high sleeper would be buried until its top is almost flush on one end and pretty much sitting at ground level on the other across a 2m spam. Worth AG piping? The ponders. the internal square the sleepers border is gonna be filled with high drainage material anyway, and the pretty much ground level low area means it can just piss out the bottom…