looking good! Sadly we’re still potting, gotta finish the paving so I have the ground level for the food garden area and can start levelling and putting down wicking beds
And howww. Got the drainage done (trenches pics), smashed up the old collapsing pathway, dug it all down 20cm, now roadbase, then sand, then old path back as crazy paving, with a new grade that then means we can start putting the new level in what was a massive garden bed full of garbage, then wicking beds (so’s we can use when old and creaky, plus better water usage) and the pergola, and the firepit and the bbq paving and the car hole and the shed and and and and and…
looking good! Sadly we’re still potting, gotta finish the paving so I have the ground level for the food garden area and can start levelling and putting down wicking beds
Looking forward to piccys when you’re done (or even progress piccys) :) Sounds like a shitload of work you’re doing.
And howww. Got the drainage done (trenches pics), smashed up the old collapsing pathway, dug it all down 20cm, now roadbase, then sand, then old path back as crazy paving, with a new grade that then means we can start putting the new level in what was a massive garden bed full of garbage, then wicking beds (so’s we can use when old and creaky, plus better water usage) and the pergola, and the firepit and the bbq paving and the car hole and the shed and and and and and…