• bui@lemm.eeOP
    link
    fedilink
    English
    arrow-up
    5
    ·
    1 year ago

    Myki was a shitshow when it was introduced. This is just more of the same.

    • cuppaconcrete
      link
      fedilink
      English
      arrow-up
      5
      ·
      1 year ago

      This smells like corruption though, asking a bidder to raise their price to make the preferred bidder win the contract. I honestly can’t remember, were these shenanigans going on with the original Myki tender too?

      • bui@lemm.eeOP
        link
        fedilink
        English
        arrow-up
        5
        ·
        1 year ago

        I can’t find a source but it was decided that the original Myki should be built as a custom solution at a greater expense and with a slower rollout even though there were already off-the-shelf solutions that were working around the world that would have been faster and cheaper to implement.

      • prime_factor
        link
        fedilink
        English
        arrow-up
        2
        ·
        1 year ago

        Remember Transdev winning the bus contract on being cheap, then completely skimping on maintenance.

        A contracts price is going to be entirely dependant on its scope. The trouble though the scope can be manipulated to prefer a certain bidder.