• malloc@programming.dev
    link
    fedilink
    arrow-up
    13
    ·
    1 year ago

    Older scrum masters during the daily standup and trying to do live updates to the JIRA board

    Turned 15 minute meeting into 30 minutes at times lol.

    • psud
      link
      fedilink
      arrow-up
      1
      ·
      1 year ago

      I let my stand-in scrummy drive the TFS board this morning. In adding a PBI to the sprint he typed the iteration manually (a pretty long path name), rather than clicking the context menu and selecting “current iteration”