• psud
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    I let my stand-in scrummy drive the TFS board this morning. In adding a PBI to the sprint he typed the iteration manually (a pretty long path name), rather than clicking the context menu and selecting “current iteration”