• naeap@sopuli.xyz
    link
    fedilink
    English
    arrow-up
    9
    ·
    10 days ago

    Will take some time until the contracts are signed/accepted (sorry, missing the right word here), and afterwards to actually fulfill those contracts. 3 months don’t even seem enough time for that, imho.
    But I don’t have much insight, how fast such things usually are processed

    • Benjaben@lemmy.world
      link
      fedilink
      English
      arrow-up
      5
      ·
      10 days ago

      You’re right, but I will say the federal govt has a sometimes magic way of greasing certain wheels and getting things done in a hurry, if the right person is pushing on it.

    • disguy_ovahea@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      10 days ago

      Fair point. I’m not sure myself, but it won’t be enough time if they’re anything like the general contractors I’ve used.