Well yes, we shouldn’t switch things off before replacements are switched on. But that means we should be targeting replacements that can be switched on quickly. Nuclear is not quick.
I think you’re assuming an infinite capacity of funds and people to build the things. If that were true, then yes we should be going for both renewables and nuclear. However it isn’t, and renewables provide far better value and can be built far more quickly.
We need to build both, but we can’t build it all at once. It makes sense to build all or most of the cheap and quick renewables first, in an excess (which before long will become capacity again), to get the fossil fuels switched off as quickly as possible, and then fill out the portfolio with nuclear.
You’re not really making sense there. Prices in MWh is what the market charges at, and renewables are FAR cheaper per MWh than nuclear. However there is a disconnect between the generation market and consumer markets - as a consumer, you don’t see any difference. Regardless, I haven’t been saying that 1MW of renewables is the same as 1MW of nuclear. I’ve been saying we need to build an excess of renewables everywhere to account for the times it isn’t available in some locations.
Yes, they do. There are only so many people in the industry. I say this as an electrical engineer who has worked throughout (renewables, nuclear, factories, basically anything with HV). There is also production capacity, but we haven’t reached this yet with renewables and it can be expanded - however when we do get closer to it then it will make more sense to put money into nuclear. Money is also a limiting factor, particularly when it comes to government finance, and is perhaps the biggest limiting factor of all.
Wind farms take up a lot of space, solar can go on roofs, hydro requires bodies of water. Hydro is very location specific, wind somewhat, solar not very much. However the biggest obstuction of all is the NIMBY attitude.
Well yes, we shouldn’t switch things off before replacements are switched on. But that means we should be targeting replacements that can be switched on quickly. Nuclear is not quick.
Removed by mod
I think you’re assuming an infinite capacity of funds and people to build the things. If that were true, then yes we should be going for both renewables and nuclear. However it isn’t, and renewables provide far better value and can be built far more quickly.
We need to build both, but we can’t build it all at once. It makes sense to build all or most of the cheap and quick renewables first, in an excess (which before long will become capacity again), to get the fossil fuels switched off as quickly as possible, and then fill out the portfolio with nuclear.
Removed by mod
Removed by mod