- cross-posted to:
- [email protected]
- cross-posted to:
- [email protected]
First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.
last time I checked the renewables being installed didn’t even offset the new energy demands being created, let alone making a dent in starting to decarbonize existing demand.
and the main reason is, that we need to tackle climate change from as many angles as possible and not eliminate a fine energy source just because something else is cheaper.
I mean for now renewables are cheaper, do you think we have enough raw materials to cover all of earths energy needs?
what happens when the raw materials will start to run dry but we still need to cover a bunch of energy needs, is that when we dust off the good ol Nuclear plants?
not to mention Nuclear plants provide a stable base load, no need for smart electronic devices that use power when it’s most abundant etc. it’s just power, that runs, constantly.