Images are from the Northwest Power and Conservation Council’s interactive map.

The hydroelectric marker for Grand Coulee Dam is not to scale. It should be larger. If drawn to scale it would dwarf the nearby markers.

According to the overview, the map does not include small producers in order to limit the number of markers. For the following sources, only producers above the specified cutoffs are shown:

  • Hydropower: above 5 MW (Idaho) or 20 MW (other)
  • Natural Gas & Wind: above 10 MW
  • Biomass: above 1 MW
  • jrs100000@lemmy.world
    link
    fedilink
    English
    arrow-up
    9
    arrow-down
    1
    ·
    1 year ago

    Is there a reason Hoover dam isn’t on there? With a capacity of around 2000MW it should be a pretty big circle, but it isn’t even listed in the drop down menus.