Microsoft Looking to Use Nuclear Reactors to Power Its Data Centers::undefined

  • Earthwormjim91@lemmy.world
    link
    fedilink
    English
    arrow-up
    2
    ·
    1 year ago

    That’s got nothing to do with Microsoft though. Their reactor wouldn’t be used to power other people, only their own data centers.

    They currently buy that from the grid, and they don’t really have any control over the source of that electricity generation. We should absolutely be pushing the power generators to go with renewables, but Microsoft isn’t a generator. They’re a customer like you or me.

    They’re looking at moving to small reactors eventually because of the cost of buying from the grid, not for the environment.

    • Diplomjodler@feddit.de
      link
      fedilink
      English
      arrow-up
      2
      arrow-down
      3
      ·
      1 year ago

      It would still be far cheaper to deploy the same kind of capacity in renewables. Whoever came up with this brilliant plan can’t do basic math.

      • Earthwormjim91@lemmy.world
        link
        fedilink
        English
        arrow-up
        2
        ·
        1 year ago

        Probably not because they would need to buy MUCH more land to do it.

        SMRs are so much more compact per MW. The one from NuScale that is approved already can do 924MW in 0.05 square miles. To do the same capacity with wind would take 94 square miles and 17 square miles for solar.

        Buying 17 square miles of land close enough to just one of their data centers would cost billions, on top of the cost of paying for the panels and installation.

        The whole point of them looking at these at all is because they do not want to purchase from the grid.