Lots of corrective actions to complete, but it’s a step.

  • navi@lemmy.tespia.org
    link
    fedilink
    English
    arrow-up
    7
    ·
    1 year ago

    Hopefully they have been working with SpaceX along the way and didn’t just drop a new 60 item check list in them.

    • becausechemistry@lemm.eeOP
      link
      fedilink
      English
      arrow-up
      8
      ·
      1 year ago

      Many or all of them are things they’d do anyway (work on leaks that lead to fires) and/or are already visibly being worked on (the launch pad bidet). Formalizing the list so each thing can be checked off is part of the process to get the launch license back.