cm0002@lemmy.world to Programmer Humor@programming.dev · 2 days agoDevelopment Methodslemmy.mlexternal-linkmessage-square52fedilinkarrow-up1736arrow-down152cross-posted to: [email protected]
arrow-up1684arrow-down1external-linkDevelopment Methodslemmy.mlcm0002@lemmy.world to Programmer Humor@programming.dev · 2 days agomessage-square52fedilinkcross-posted to: [email protected]
minus-squareRizzoTheSmall@lemm.eelinkfedilinkEnglisharrow-up41·1 day agoWhat’s not covered is the 25 years of R&D in advance of waterfall project starting, or that it’s delivered 200% over time and cost due to those requirements being insufficient and based on assumptions that were never or are no longer true.
minus-squaremadjo@feddit.nllinkfedilinkarrow-up1·9 hours agoBut at least the rocket has an opulent ball room as per the design spec
What’s not covered is the 25 years of R&D in advance of waterfall project starting, or that it’s delivered 200% over time and cost due to those requirements being insufficient and based on assumptions that were never or are no longer true.
But at least the rocket has an opulent ball room as per the design spec