NPCI is building two 700MW pressurised heavy water reactors (PHWR), including Units 3 and 4 at Kakrapar, where there are two 220MW power plants. Officials say that in July, the fourth unit recorded 97.56% progress.

Wonder why they’re building these instead of thermal coal plants

      • Zippy@lemmy.world
        link
        fedilink
        arrow-up
        14
        arrow-down
        1
        ·
        1 year ago

        From a guy that installed a 5kw system on my house in Mexico, Solar non base load systems are so inconsistent that they are a poor choice if you want to really help people. You need base load power generation otherwise you will have very unstable power grids.

      • GenEcon@lemm.ee
        link
        fedilink
        arrow-up
        12
        ·
        1 year ago

        It took India 16 years from planning to operation. So it will not only be cheaper, but a lot faster as well.

      • w2qw
        link
        fedilink
        arrow-up
        12
        arrow-down
        1
        ·
        1 year ago

        India is building a ton of solar as well.