I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?
Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).
I’m sure enough air is moved simply from the train moving by, but there will probably still be rocks and stuff flying around