[T]he report’s executive summary certainly gets to the heart of their findings.
“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”
Nuclear waste and fuel is dangerous for years and is an invisible hazard. Propane and gas at least only explode once
Thoughts on CO from malfunctioning boilers?
The two aren’t even part of the same conversation.
It builds up for days even months and is an invisible hazard?
I’m not engaging on this.