Turrella station in Sydney has maintained full function during the (still ongoing) elevator installation and stairs rebuild. They’ve installed temporary stairs on one end. The contractors can be as slow as they want, all it does is make people have to walk an extra 50m.
It’s had some shutdowns, but for other work (wires & tracks & signals) and typically short.