Image uploads are still broken, but uploading to lemmy.world seems to have worked, yesterday, so…

A few finishing touches, and I’m happy with this one.

With a little extra space available at the main entrance, I figured some lighting was in order.

Decided to try elevated machine floors this time, instead of sunken.

Also decided to try keeping the miner indoors, right next to the production machines.

To get the machines to be fully supported by the elevated platform, I needed 13m of width, so I was left with a full foundation, a half-foundation, and 1m extra. I was trying to figure out how to cleanly cover that extra meter, when I realized, “Wait, what if I… didn’t?”

What if I actually USED it, instead?

Moving ownard, I made a little change in plans. I think I’m actually going to do 5 separate interconnected buildings, instead of just 3. This one here will be turning Copper Ingot into Wire.